Tuesday, June 29, 2010

Improve your performance management with new version of ISO 9001

A quality management system enables you to manage your business processes effectively:

it is much more than a set of rules and procedures. When properly implemented and maintained, a QMS addresses the needs of your organisation and delivers tangible business benefits.

The new version of ISO 9001 has recently been published. One of the main aims of ISO 9001:2008 is to facilitate integration with other standards. Although there are no new requirements as such, there are some key clarifications to be taken into account.

There are three main objectives to the new standard:

Detail, clarify, improve the understanding of ISO 9001:2000 (previous version)

Improve compatibility with ISO 14001:2004 Simplify the way in which ISO 9001 can be integrated with other management system standards (such as OHSAS 18001)

There are no new requirements in the new standard:

The title, scope, and structure of the standard are unchanged

The process approach is confirmed

Compatibility with the latest revision of ISO 14001:2004 is maintained and improved upon

Preservation of the quality management principles included in ISO 9000:2000

There are five main areas to note. The relevant sections of the standard are noted in brackets.

1. A reinforcement of the notion of product conformity

2. Compatibility with other standards is evolving

3. A better understanding of outsourced processes

4. An editorial clarification of some requirements – for instance;

A reinforcement of the notion of product conformity2.3.4.

An editorial clarification of some requirements – for instance;A better understanding of outsourced processesCompatibility with other standards is evolving

• (6.4) work environment, including an explanatory note on work environment giving examples,

to help meet product conformity requirements

• (8.2.1) measurement of customer satisfaction, including a note broadening the scope beyond

satisfaction surveys to include other channels such as customer feedback5.

• (Introduction) the notion of risk

• (5.5.2) appointment of a management représentative

• (6.2.2) assessing the effectiveness of achieving compétence

• (8.5.2 et 3) assessing the effectiveness of corrective and preventive actions?

Some additional explanations regarding the requirements of the standard;An editorial clarification of some requirements – for instance;A better understanding of outsourced processesCompatibility with other standards is evolvingA reinforcement of the notion of product conformity.

Implementing ISO 9001 Standards

Implementing ISO 9001 standards

If you have your own business and now you are looking for ISO 9001 certification for quality standards for business to make your business products more reliable to the customers. To be in the market for any business, it needs quality and for quality any business needs to follow quality standards, so ISO 9001 Standards developed many quality standards as per different -different business areas.

ISO 9001 Standards is a generic quality standard and can be applied to any organization but before applying it, a process starts with pre-assessment audits and passes through on-going maintenance. The process of implementing ISO 9001 includes identifying, collecting and organizing the information required for certification.

For implementing ISO 9001 standards, any organization needs to hire a consultant because detailed knowledge of ISO standards is essential before successfully applying it. A consultant will analyze your organization structure, your products and their standards and will make a complete plan as per ISO standards for your organization.To hire a consultant is easiest way because they have complete knowledge of ISO standards and they perform various activities like provides class room training to your business employee about ISO 9000 standards

An ISO consultant performs the various activities and explains the course objectives :

• understand the purpose of ISO 9000: 2005, ISO 9001: 2008, ISO 9004: 2000, ISO 19011: 2002 etc. standards and their interrelationship

• describe the purpose of Quality Management Systems and 8 Quality Management Principles

• Interpret the ISO 9001: 2008 in the context of audit

•Plan and conduct an audit in accordance with guidelines as per ISO 19011: 2002, gather objective evidence via various methods and determine conformity to the requirements of Quality Management Systems

• Develop understanding of Roles & Responsibilities of Lead Auditors

Hiring a Consultant is a better and easiest way to implement ISO in your organization.

Document Control System in Manufacturing Industry

Document Control System In Manufacturing Industry

Many traditional paper documents would be generated in a manufacturing business as in the examples listed below:

  • Statutory documents such as licenses, records and reports
  • Transactional documents such as purchase and sales invoices, shipping documents and cash vouchers
  • Production related documents such as operations manuals, specification sheets, production and maintenance schedules, machine production reports, material handling documents, store bin cards and gate passes
  • Management reports where the recipient prefer printed paper documents to computer screen views
  • Business documents such as correspondence, contracts, brochures and reference materials

However, in a modern system, the majority of documents would be generated as computer documents, and remain as such. Different kinds of databases like financial accounts, inventory records and different kinds of analyses are examples. The core functions outlined in the previous section would each produce a continuing flow of voluminous documents.

In addition to providing management information, document management systems also do the following:

  • Ensure that only authorized persons are able to access sensitive documents
  • Minimize the danger of damage and loss of important documents
  • Preserve the documents as long as needed by statute or for management purposes

Corrective and Preventive Actions In ISO 9001 Standard

Corrective and Preventive actions are used to adjust the manufacturing processes, quality system and product documentation to continuously improve product and service quality. This process never ends. Corrective and preventive actions are usually based on an engineering change request and engineering change order system. In general it is recommended that all feedback from internal and external sources be entered into the engineering change request system. This can include customer survey results, customer complaints, nonconforming material data, field failure data, work-in-process testing results, internal audit results, external audit results and suggestions from personnel. The inputs are then entered into the Engineering Change Request System. This system is used to queue workload for the engineering and quality problem solvers. The engineering manager or quality manager then reviews this bulk of requests for prioritization. The highest priority issues are assigned to personnel who create an engineering change order to correct the problem. Some engineering change requests will be denied and the denial will be justified in the ECR system before the item is closed. Other requests will generate an Engineering Change Order that includes an assignment to a project manager. The engineering change order will include complete details on how to correct the problem and when the change will take effect. This system is a closed loop system that will continuously improve quality. The status of the ECR and ECO systems should be used as input for the management review meetings.

The process of managing this data usually requires a database since priorities change on a daily basis and the amount of input can be very large, even at small companies. A database is also advised since the system can be used to generate automated reports that are used in the management reviews. Without constant supervision, engineering requests and change orders can pile up and start dragging down the company.

Corrective and preventive actions are listed separately in the standard to drive home the point that you can not have successful company that only corrects problems, you must prevent problems.

Corrective and preventive actions also go hand-in-hand with the requirement for continuous improvement. If the company is analyzing their mistakes, anticipating future mistakes and continuously improving, The quality of the product and services at the company will eventually be GREAT. The corrective and preventive actions system is the most critical element for an efficient quality system. Corrective and preventive actions are made using Engineering Change Requests (ECR) and Engineering Change Orders (ECO).

Any quality problem or suggestion should generate an ECR. This is the queue for engineering. If the engineering/quality manager decides that an action is required, then an ECO is created and assigned to someone with the resources to correct and prevent future problems.

ECOs should be generated by negative customer feedback, negative trend in product performance, observed areas for improvement, upgrades to documentation, or any other continuous improvement activities. Engineering change orders are the lifeblood of the organization and they must always be flowing to keep the organization strong and growing.

With this in mind, it is critical that the engineering change order system quick, simple and effective. I highly recommend the use of a database for managing ECRs and ECOs. This will give you a searchable history of changes to your products and is the best tool for continuous improvement.